On this page
  1. Conditional picks
  2. Identify the joint
  3. Code comes first
  4. Before opening a can
  5. Two-step assembly
  6. Compare the roles
  7. The joint decision matrix
  8. Clear primer and cleaner
  9. Wet primer and cure
  10. Already joined without primer
  11. When to call a pro
  12. Common questions
  13. How I pick

Three products for two joining methods

P-70 prepares the surfaces, and Weld-On 705 is the separate cement that goes on after it. Fusion is a PVC cement with a conditional no-primer route. Confirm the method before choosing a can.[5][10][6]

Method reference

Weld-On 10223 P-70

$42.02 at Amazon
Check it on Amazon
Price as of Nov 22, 2026, 9:30 AM EST
Method reference

Weld-On 705, 1 pint

$13.99 at Amazon
Check it on Amazon
Price as of Nov 22, 2026, 9:30 AM EST
Oatey Fusion clear single-step PVC cement, 10 oz
Best for permitted primer-free PVC DWV

Oatey Fusion, 10 oz

$9.69 at Amazon
Check it on Amazon
Price as of Nov 22, 2026, 9:30 AM EST
ToolKey specsPick it ifSkip it if
Weld-On 10223 P-7010223, 107700421, 1 quart, Purple, ASTM F656, Rigid PVC/CPVC[5]The approved PVC or CPVC procedure calls for purple primer, especially where the maker specifies P-70 for large pipe or Schedule 80.[5]You need cement rather than primer, have ABS, or are working on an appliance flue. Check the exact system instructions before choosing a solvent.
Weld-On 705, 1 pint10093, 1 pint, Clear, Medium-bodied, Fast set, ASTM D2564, NSF/ANSI 61 (maker specifications)[10]The procedure is two-step: P-70 first, then a PVC cement, on pipe through 6 in., or Schedule 80 through 4 in.[10][5]The pipe is CPVC or ABS, which need their own cements, or it’s larger than the 705’s 6 in. limit.[10]
Oatey Fusion, 10 oz32192 maker package, 10 oz, Clear, Medium-bodied, PVC, ASTM D2564[6]The exact PVC DWV installation is approved for this primer-free cement method and the pipe, fitting and cement instructions agree.The adopted rule requires two steps, your pipe maker requires primer, or you are applying the drainage exception to pressure pipe or CPVC.

Weld-On’s 705 page says it can be used without primer on non-pressure systems if local codes permit. That’s the same condition this page keeps coming back to: the code you work under decides, not the can. Where primer is required, P-70 goes on first and the 705 follows while the primer is still wet.[10][4][5]

Start with the lettering on the pipe

PVC, CPVC and ABS have different joining instructions. White, gray or yellow plastic alone is not enough information to choose a primer or cement.

1. Identify pipe and service PVC / CPVC / ABS Drainage or pressure? Flue and conduit: separate path. 2. Check adopted code Model IPC: limited DWV exception Model UPC: purple two-step Georgia: published amendment Confirm edition and local rule. 3. Read exact maker instructions Pipe and fitting procedure Cement, primer and size All exception conditions satisfied? Choose the documented method: purple primer plus cement, or a permitted primer-free route. Any missing document or conflict: stop and confirm with the maker and approving authority. 1. Read the pipe marking PVC, CPVC or ABS? Identify drainage or pressure. 2. Check the governing rule PVC DWV: IPC, UPC or an adopted amendment? Do not use DWV exceptions for a pressure-water line. 3. Match maker instructions Exact pipe and fitting system. Exact cement and primer. Check size and certifications. 4. Choose the approved method Purple two-step if required. Primer-free only if permitted. Unknown or conflicting? Stop and confirm first.
For PVC DWV, check the adopted code, then the pipe and cement instructions. The 2024 model IPC exception and Georgia’s amendment have different conditions; confirm the rule that governs your permit.[1][2]
PVC drain, waste and vent

Use the drainage-code path below. A model-code exception for a nonpressure DWV joint does not extend to every PVC installation.

PVC carrying pressure

Use the pressure-piping requirements and the exact pipe and cement instructions. The IPC drainage exception discussed here is limited to nonpressure work.

CPVC water pipe

Check the pipe maker’s approved one-step or two-step system. A PVC cement name or a purple stain cannot establish CPVC compatibility.

ABS drainage

Use the ABS maker’s joining method. Charlotte does not recommend primer for ABS; PVC/CPVC primer is not a universal plastic-pipe preparation liquid.[4]

Read the pipe marking and identify what the line carries before buying solvent products. A drain, waste and vent line is the DWV application in the IPC exception. A water-supply line under pressure belongs to a different code path, even when both pieces are marked PVC.

Read the fitting markings too. A PVC pipe entering an ABS fitting is a material-transition question before it is a primer question. Use the approved transition method for that installation. Do not assume a can marketed for several plastics approves every mixed-material joint.

Appliance vents and electrical conduit are outside this drainage method. Weld-On’s P-70 sheet excludes flue-gas ventilation systems. A qualified appliance technician should follow the appliance instructions; conduit work needs its own listed products and electrical requirements.[5]

Primer required and purple required are separate checks

First ask whether a separate primer is required. If it is, check whether the applicable rule specifies purple. Clear primer answers only the color question.

The model IPC default

The 2024 model IPC section 705.10.2 specifies purple primer meeting ASTM F656 for PVC drainage solvent joints. It also contains a limited no-primer exception.[1]

The IPC exception

The model IPC exception requires third-party-certified ASTM D2564 cement, nonpressure PVC DWV through 4 inches, and assembly under ASTM F3328. Check all of these, plus compatible maker instructions.[1]

The model UPC answer

IAPMO’s February 2026 explanation says unamended 2024 UPC Chapter 7 requires purple F656 primer followed by D2564 cement for PVC DWV. One-step cement does not satisfy that requirement.[3]

The Georgia amendment

Georgia’s published replacement for section 705.10.2 makes priming conditional on the solvent manufacturer’s requirement. When required, the primer must be purple and meet F656. Confirm which edition and amendments govern your permit.[2]

The model International Plumbing Code is a starting point for adoption. A state or local jurisdiction can amend its wording. An inspector’s reference to “the plumbing code” is incomplete for your decision until you know the edition and the amendments that apply to that installation.

The model IPC exception is a set of conditions, not a general statement that small PVC never needs primer. A D2564 statement on the cement can answers the cement-standard question. It does not, by itself, establish the other exception conditions or override the pipe maker’s joining instructions.[1]

Georgia illustrates why a national yes-or-no answer falls short. Its published drainage section changes the trigger for primer, but keeps purple F656 primer when that trigger applies. It also specifies non-purple cement and wet assembly under D2855. Check the actual adopted text instead of carrying the model IPC exception into the amended section.[2]

My call: get the approval settled before making an exposed joint clear for appearance. If the applicable section specifies purple, a clear F656 primer still leaves the color requirement unresolved. A UV-visible product likewise needs acceptance for that particular requirement; visibility under a special light is not permission on its own.[1][5]

Bring four documents to the decision

For a primer-free proposal, match the exact pipe, exact cement and actual local rule. A product name that says single-step is only one part of the answer.

  1. Identify the governing section

    Record the jurisdiction, code edition and local amendment for this joint. Ask whether the PVC DWV exception is adopted unchanged, altered or unavailable.

  2. Read the pipe and fitting instructions

    Find the maker’s procedure for the material, diameter and application. If that procedure calls for primer, resolve any proposed no-primer method with the manufacturer and inspector before assembly.

  3. Read the exact cement label

    Match the SKU, pipe material and size limits. Confirm any certification required by the local exception, rather than assuming that “meets D2564” supplies every approval.[1]

  4. Resolve the joining method

    Check the specified assembly standard, primer color, applicator and cure instructions. If the documents conflict, stop and have the manufacturer or licensed plumber clarify the method.

For the inspector, describe the actual proposal: “This is nonpressure PVC DWV, this diameter, this pipe maker and this cement SKU. Does the adopted section permit assembly without separate primer?” That is more useful than asking whether purple primer is required anywhere in the county.

Keep the label and relevant installation sheet with the job record. If the method uses a no-primer exception, include the certification and joining-standard evidence it requires. That record lets the approval discussion concern the proposed joint rather than the general reputation of a brand.

How the two-step PVC method fits together

This sequence follows Charlotte’s 1/2- to 4-inch iron-pipe-size PVC procedure, printed pages 57–59 of TM-PL. Use it with the selected cement label; CPVC systems need their own joining instructions.[4]

Make the solvent area safe first

Charlotte warns that primer and cement vapors can ignite and may collect in new piping. Provide adequate ventilation and keep away from flame, heat and sparks. Follow the product SDS for protective gloves, eye and face protection. If you cannot control vapor or ignition exposure, stop and call a qualified professional.[4]

Do not adapt this to a live pressure repair

Have a licensed plumber isolate and depressurize the system under its maker’s instructions before cutting or opening it. Unknown shutoffs, hot-water piping, appliance connections and inaccessible failures need a system-specific plan.

  1. Prepare the PVC ends

    Cut square, remove inside and outside burrs, and bevel the pipe end 10 to 15 degrees. Clean and dry the joining surfaces.[4]

    With light pressure, the dry pipe should enter 1/2 to 2/3 of the fitting hub depth. Do not use pipe and fittings that are too tight or too loose.[4]

  2. Match the applicator to the pipe

    Charlotte calls for an applicator about half the pipe diameter in this procedure. A small can’s supplied dauber is not automatically suitable for every pipe size.[4]

  3. Prime the socket and pipe

    Work primer into the fitting socket, then the pipe surface to 1/2 inch beyond the hub depth, then the socket again. Remove excess primer puddles from the socket. Hard surfaces or cold conditions may need more primer applications. Maintain ventilation, ignition control and product-SDS PPE throughout.[4]

  4. Apply cement while the primer is wet

    Stir or shake the cement before use. Work a full, even layer onto the pipe to 1/2 inch beyond the hub depth while the primer is wet. Without re-dipping the applicator, work a medium layer into the fitting socket; on bell-end pipe, do not coat beyond the socket depth.[4]

    Add a second full coat to the pipe, working it into the surface. Do not let cement puddle or collect inside the system. Follow the selected cement label alongside Charlotte’s procedure.

  5. Insert and hold the joint

    Assemble while cement is fluid. If the cement has hardened, cut the pipe, discard the fitting and start over.[4]

    Give the pipe a quarter turn during insertion and seat it fully against the socket bottom. Hold until the pipe does not back out. Do not quarter-turn it after it reaches the stop.[4]

  6. Leave it aligned through cure

    Do not bend or pull the joined pipe into position. Use the cement’s applicable set and cure instructions before handling or testing. Charlotte prohibits compressed-air or gas testing of these plastic systems.[4]

The extra coats are deliberate in Charlotte’s method. “One pass only” is not a safe universal instruction. Large-diameter piping has a separate procedure and should be handled by trained installers.

Compare the roles before comparing the cans

The decision is about an approved joining method. P-70, Weld-On 705 and Fusion fill different parts of that decision.

ProductUseUseful featureLimitBuy
Weld-On 10223 P-70Separate purple primerSpecified Schedule 80 and large-pipe preparation[5]Separate cement required; no flue useCheck it on Amazon
Weld-On 705Separate PVC cement for the two-step methodFast set, all PVC classes and schedules through 6 in.[10]PVC only; Schedule 80 through 4 in.[10]Check it on Amazon
Oatey Fusion clear single-step PVC cement, 10 ozOatey FusionConditional primer-free PVC DWV cementSelf-priming where the exact method is permittedCode and pipe maker must permit itCheck it on Amazon
Oatey Fusion clear single-step PVC cement, 10 oz can
Oatey Fusion, for a permitted one-step joint. Product photo: Amazon.

Can this exact joint skip purple primer?

Read across your row, then check the documents. “Conditional” means the listed evidence is still required; it does not mean the installer can choose either method by preference.

Pipe and applicationGoverning documentSeparate primer?Purple?Conditions, and what to check first
PVC DWV, ordinary two-step cement2024 model IPC 705.10.2[1]Default: yesDefault: yes, F656[1]Use the applicable pipe and cement instructions. Check: adopted section; current labels.
PVC DWV through 4 inches, proposed no-primer methodModel IPC exceptionConditional omissionNone only if omission is permittedThird-party D2564 certification; nonpressure DWV; F3328 assembly. Check: all exception conditions and compatible maker instructions.[1]
PVC DWV larger than 4 inchesModel IPC exception boundaryNot excused by that exceptionApply governing ruleA larger cement size rating does not expand the exception. Check: applicable section and exact joining method.
PVC DWV under unamended 2024 UPCIAPMO explanation of 705.6.2[3]Yes, two-step processYes, F656[3]D2564 cement follows primer. Check: confirm UPC edition and local amendments.[3]
Georgia PVC drainagePublished replacement 705.10.2[2]If required by solvent manufacturerYes, when primer requiredNon-purple listed cement; wet D2855 assembly. Check: confirm governing adoption; pipe/fitting and cement instructions.[2]
PVC pressure pipePressure-piping requirementsFollow governing instructionsFollow governing ruleDo not apply the DWV exception. Check: pressure section and system-specific procedure.
CPVC water pipeCPVC system instructions and adopted water-piping sectionOne-step or two-step as permittedCheck the prescribed methodPVC no-primer permission does not establish CPVC permission. Check: exact pipe system and compatible CPVC cement.
ABS drainageABS maker instructionsCharlotte does not recommend primerDo not use the PVC purple-primer routeUse the specified ABS joining method. Check: material markings and ABS instructions.
Flue vent or electrical conduitAppliance or conduit requirementsOutside this decision pathOutside this decision pathP-70 excludes flue-gas ventilation. Check: qualified service provider and exact system instructions.[5]

Unknown code, unreadable pipe markings or conflicting maker instructions: stop and confirm. This matrix compares the named documents; the jurisdiction decides what applies to the actual installation.

A 3-inch drain can satisfy the diameter part of the model IPC exception and still fail another condition. For example, a pipe maker may prescribe primer, or the installer may lack the required cement certification. Check each condition rather than treating the diameter as the whole decision.[1]

A 6-inch drain highlights the opposite mistake. Fusion’s product sheet describes a larger nonpressure capability, but that statement does not alter the 4-inch limit in the model IPC exception. A different adopted rule might produce a different answer. Find that rule before assuming the larger joint can use the same primer-free route.[6][1]

Burial is another separate question. The model IPC solvent-joint section permits joints above or below ground. Whether a joint is buried does not, by itself, supply the primer exception. Follow the applicable installation and inspection requirements before covering any completed work.[1]

Clear primer, cleaner and clear cement do different jobs

Read the product role and standard. A clear liquid in a similar can can be primer, cleaner or cement; color alone cannot identify what the joint needs.

What is on the shelfWhat it changesWhat it does not establish
Purple primer, F656Prepares the compatible joining surfaces; leaves purple colorCorrect cement selection, assembly or cure
Clear primer, F656Prepares compatible joining surfaces without purple dyePermission to replace a specified purple primer
CleanerRemoves contaminants as directedThe priming function; Oatey says cleaner is not a substitute[7]
Regular Clear PVC cementProvides the solvent cement for the approved methodPrimer-free permission; its sheet calls for primer
Self-priming PVC cementCombines the product’s stated functions for permitted applicationsAcceptance under every code or pipe system
UV-visible primerMay provide a different way to detect primerAcceptance in place of a rule requiring purple

Oatey’s primer guidance separates cleaning from priming. Its Purple Primer specification describes preparation that cleans contaminants and softens the compatible PVC/CPVC surfaces.[7] A cleaner claim does not establish that a separate product performs the required priming work. Check the named primer rather than relying on the solvent smell.

Regular Clear is a useful example because its name can mislead at the shelf. Oatey’s technical specification calls for a listed primer in the joining steps. Its D2564 cement standard does not make that instruction disappear. “Clear” describes the cement, not approval to omit preparation.[8]

For visible finish work, settle clear-primer acceptance before cutting. Ask which product and inspection evidence the authority accepts for the exact installation. If purple is specified, avoid assuming a neat-looking clear joint will be accepted later because the underlying primer meets F656.[1]

Wet primer is an assembly instruction, not a cure time

The wait before testing comes after assembly. It should not be confused with leaving a required primer coat to dry before cement goes on.

StageWhat the maker meansDecision to make
Primer to cementCharlotte and Oatey’s primer sheet specify cement while primer is wet[4][8]Have the correct cement and applicator ready before priming
Holding the assembled jointKeep the pipe from backing out under the selected procedureFollow that product’s holding direction; do not generalize one duration
Handling strengthEnough initial set for the handling described by the makerDo not treat this stage as full testing approval
Cure before testing or serviceUse the chart and notes for the exact cement and conditionsCheck size, temperature and other conditions before restarting

Oatey Regular Clear’s sheet gives a 30-second hold, longer in cold conditions. Charlotte’s illustrated small-diameter method says to hold until the pipe does not back out. Keep each direction attached to its own procedure. A remembered hold time from a different cement is not a cure instruction.[8][4]

Regular Clear also separates its 15-minute handling period from cure before testing. That difference matters if you finish a repair and immediately want to run the system. Read the relevant chart and its notes for the actual pipe size and conditions; do not convert “handle” into “return to service.”[8]

For an inspected repair, agree on the testing method as well as the waiting period. Charlotte warns against compressed air or gas testing of these plastic systems. Fusion’s sheet also prohibits air testing. A fast pressure check with an air compressor is not an acceptable shortcut to the maker’s approved test.[6][4]

Already made the joint without primer?

First identify whether primer was required for that exact joint. A missing purple stain alone cannot tell you whether clear primer or an approved one-step method was used.

  1. Record what was actually used

    Keep the pipe and fitting markings, cement SKU and any primer container. Note whether the line is PVC drainage, PVC pressure or CPVC. Do not infer the method from color alone.

  2. Check the applicable permission

    Compare those materials with the adopted section and maker instructions. An approved one-step joint and a required-primer joint made without primer are different cases.

  3. Have a questionable joint assessed

    Call a licensed plumber for pressure piping, concealed work, uncertain materials or conflicting directions. Do not pressurize an unapproved assembly to see whether it holds. Before opening a pressure line, the plumber must isolate and relieve pressure under the system instructions.

  4. Resolve the repair before covering it

    If the required procedure was not followed, have the installer and approving authority settle the remedy. Do not treat a coat of primer on the outside as evidence that the mating surfaces were primed before assembly.

Exterior primer reaches an exterior surface. The preparation requirement concerns the surfaces inside the socket before they are joined. My recommendation is to assess a missed step against the actual instructions, rather than painting a purple ring onto a completed fitting and treating that as the original procedure.

A leak also needs more information than the primer question alone. Record the fit, materials and cure conditions for the professional who assesses it. Do not label every failed PVC joint a missing-primer failure, or assume a joint that has not leaked proves the approved process was followed.

Stop when the system or solvent work is uncertain

Pressure, hot water or an unknown shutoff

Have a licensed plumber identify the system and use its isolation and pressure-relief procedure. This drainage explanation does not provide a water-heater, gas or electrical shutoff procedure.

Flammable vapor without safe ventilation

Charlotte and the solvent warnings require ventilation and ignition control. Follow the exact SDS PPE. Stop if the location cannot meet those precautions; an ordinary fan is not established as safe equipment around flammable vapor.[4]

Appliance vent or wiring involvement

Use a qualified appliance technician or electrician and the exact system instructions. P-70 excludes flue-gas ventilation systems; a plumbing-DWV exception does not approve a vent or conduit repair.[5]

Code and label disagree

Ask the maker and approving authority to resolve the specific conflict before assembly. Choosing whichever document seems to permit fewer steps leaves the joint approval unresolved.

Common questions about purple primer

Is purple primer required by code for PVC drains?

Often, but the adopted wording decides. The 2024 model IPC default specifies purple F656 primer with a limited no-primer exception. IAPMO says the unamended 2024 UPC requires the two-step purple-primer process.[1][3]

Georgia’s published amendment changes when primer is required. Check the edition, amendments and maker instructions for the joint.[2]

Can I use clear primer instead of purple?

Only if the governing requirements accept it. A clear primer can meet F656 and still fail a separate purple-color requirement. Resolve that permission before assembling exposed PVC work; the absence of a purple stain is not its own approval.[5][1]

Can I use PVC cement without primer?

Only with an approved method for that exact application. The model IPC exception requires third-party-certified D2564 cement, nonpressure PVC DWV through 4 inches and F3328 assembly. The pipe and cement instructions still matter. Regular Clear’s maker sheet calls for primer, so D2564 on the can alone is insufficient.[1][8]

Does the 4-inch IPC exception include pressure pipe?

No. The model IPC exception is for nonpressure PVC drain, waste and vent joints. A small-diameter pressure line does not qualify just because it is under 4 inches. Use the pressure-piping section and the applicable system instructions.[1]

Does CPVC need purple primer?

Follow the CPVC pipe maker’s permitted method and adopted water-piping requirements. Some CPVC systems allow an approved one-step cement; others require a primer-and-cement method. Do not choose by cement color alone or transfer a PVC DWV exception to a CPVC water line.

Does ABS need purple primer?

Do not apply the PVC priming method to ABS. Charlotte does not recommend primer for its ABS procedure, and Oatey does not recommend its Purple Primer for ABS installations. Use the specified ABS joining instructions and resolve mixed-material transitions separately.[4][8]

Is cleaner the same as primer?

No. Oatey says cleaner is not a substitute for primer.[7] Its primer prepares compatible PVC/CPVC joining surfaces as directed; a cleaning product does not automatically supply that priming function. Read the actual product role and instructions before using it.

Should primer dry before the cement goes on?

In the cited Charlotte PVC procedure and Oatey primer directions, apply the appropriate cement while the primer is wet. The waiting period for cure comes after joint assembly. Follow the selected product’s complete procedure rather than a universal drying-time rule.[4][8]

Does UV-visible primer satisfy a purple-primer requirement?

Do not assume it does. A UV-visible claim describes a detection feature, while a code section may specifically require purple. Ask the approving authority to accept the exact product and inspection method before using it in place of the specified primer.

What if I already cemented the joint without primer?

Identify the materials and cement, then check whether a no-primer method was permitted. Have a licensed plumber assess a joint that missed a required step, especially on pressure piping or concealed work. Exterior primer is not a substitute for preparing the mating surfaces before assembly.

How I pick and why the method matters

Why trust PlumbingPicks

I’m Isaac Daniels, a licensed journeyman plumber in Georgia. My call: choose the joining method from the actual pipe, code and cement instructions. A product name cannot settle those questions by itself.

How I pick

I choose P-70 with Weld-On 705, or Fusion, by the permitted joining method, using the applicable code and maker specifications. I match each product’s package size and chemical role to the job. A primer, a cement and a self-priming cement are listed as one kit with no shared score, because each does a different job and one formula wouldn’t be fair to all three.

Links go to the exact verified packages on Amazon. The P-70 quart and the Weld-On 705 pint are sold on Amazon by IPS Corp, the maker, and both are linked on this page.[5][10]

CheckHow the decision is made
JurisdictionIdentify adopted edition and amendments, then the applicable application section
Pipe systemUse the named pipe and fitting maker’s procedure for material, size and service
Product identityMatch the exact package and role; do not substitute a generic cement title for a verified SKU
OfferLink only the exact verified package on Amazon; otherwise describe it as a reference
MethodApply any exception conditions together with compatible maker instructions
ScoresNone: a separate primer and self-priming cement are not interchangeable performance candidates

Sources

  • ICC, 2024 International Plumbing Code, section 705.10.2, September 29, 2026 text. Confirm the adopted section and local amendments for the installation.
  • Georgia DCA, International Plumbing Code amendments packet, published 2026 revision, printed p.16, section 705.10.2. Confirm the governing adoption for the permit.
  • IAPMO, Answers & Analysis: First Quarter 2026, February 19, 2026, Solvent Cement, explaining unamended 2024 UPC section 705.6.2.
  • Charlotte Pipe, Plastics Technical Manual TM-PL, updated June 5, 2026, printed pp.52–59, joint preparation, cure and small-diameter iron-pipe-size assembly; repeated compressed-air and gas safety warnings.
  • IPS/Weld-On, P-70 Primer Industrial Grade, P70-05-2024, p.1; IPS P-70 Purple Primer product table, product 10223 and model 107700421.
  • Oatey, Fusion Single Step Clear Self-Priming Medium PVC Cement technical specification, revision February 13, 2017, pp.1–3.
  • Oatey, Purple Primer NSF Listed technical specification, revision March 15, 2013, pp.1 and 3; Purple Primer product page and Primers FAQ.
  • Oatey, Regular Clear PVC Cement technical specification, revision August 2019, pp.1–2, primer, holding and cure directions.
  • Oatey, Purple/Clear Primer SDS, version 1.1, October 19, 2023, section 2. Follow the current SDS for the product actually used.
  • Weld-On, 705 PVC product page (weldon.com): medium bodied, fast setting, all classes and schedules through 6 in., Schedule 80 through 4 in., ASTM D2564, NSF/ANSI 14 and 61, primer-free use on non-pressure systems only if local codes permit. Read Oct 22, 2026.